Jackson Lake State Park -16 Roofs

Project Overview: Jackson Lake State Park (16 Roofs & Facility Restoration)


Statement of Work (SOW)

Drengr Solutions was retained to execute the multi-facility structural rehabilitation and comprehensive reroofing of 16 commercial buildings within Jackson Lake State Park. The scope of work required a highly diversified technical approach to address varying architectural designs, structural degradation, and interior/exterior finishes.

The comprehensive scope safely executed by our team included:


Tactical Methods & Execution

Leveraging our Special Forces engineering background, Drengr Solutions approached this multi-facility project with military precision, treating a complex state park footprint as a highly coordinated operational theater.

Multi-Phase Mobilization & Logistical Staging

To mitigate the logistical friction of managing 16 distinct job sites simultaneously, work was broken down into strict tactical phases. Materials, heavy lifts, and safety equipment were staged in a centralized, secure location and deployed incrementally to active zones. This eliminated site clutter and maintained the visual integrity of the state park.

Zero-Downtime, Public-Safe Operations

A critical parameter of this mission was that all 16 buildings remained fully open and operational to park staff and patrons during construction.

Specialized Facility Compliance

Operating under state park parameters meant strict adherence to both environmental protections and specific facility compliance guidelines. Our Quality Control Manager enforced daily checks on material submittals and installation techniques, ensuring that the final architectural envelopes, paint specifications, and structural roof systems perfectly aligned with state agency expectations.